GARNEY CONSTRUCTION

Electrical
Fire Safety
HVAC
Other
Primary market: Mesa, AZ
Records
5
Total declared value
$110,949
First seen
Feb 16, 2016
Last seen
Dec 12, 2016

Recent records

DateTypeAddressDescriptionValueContractorScore
Dec 12, 2016
permit
HVAC
3••• E MCDOWELL RDCIP PROJECT C10392: BOOSTER PUMP STATION REMOVAL & REPLACEMENT. WILL INCLUDE ELECTRICAL MECHANICAL/PLUMBING, LANDSCAPING AND IRRIGATION. NEW DISINFECTION AND ELECTRICAL BUILDINGS WITH OCCUPANCY GROUPS OF F2 AND H3 CONSTRUCTION TYPE IIB WITH CMU WALLS. SPECIAL INSPECTIONS REQUIRED: STEEL, CONCRETE, MASONRY, EIFS FIRESTOPPING AT ALL RATED ASSEMBLIES. FIRE SPRINKLERS NOT REQUIRED FOR ELECTRIC BUILDIN Pro Pro
Dec 12, 2016
permit
Fire Safety
3••• E MCDOWELL RDCODE MODIFICATION ELIMINATING THE AUTOMATIC FIRE SPRINKLER SYSTEM FROM THE ELECTICAL BUILDING. Pro Pro
Sep 8, 2016
permit
Electrical
1••• W 7TH STCIP# C10597-3 - PHASE III NEW CITY WELL 25 WELL PUMP, NEW CHLORINATION BUILDING, FLOW METERS, CONNECTIONS TO VAL VISTA TRANSMISSION MAIN, ELECTRICAL UPGRADES. ONE 100 LB CHLORINE CYLINDER. EMERGENCY ALARM SYSTEM. Pro Pro
Jul 20, 2016
permit
Electrical
4••• S SIGNAL BUTTE RDCIP PROJECT: C03080 - INSTALL PUMP IN EXISTING PORTABLE WATER WELL ADD DISCHARGE PIPING. NEW PERIMETER SCREEN WALL, NEW DRYWELL, NEW PUMP WITH ASSOCIATED ELECTRIC, NEW ACOUSTICAL PUMP ENCLOSURE, NEW CONCRETE PAD, NEW 1.5" WATER METER. Pro Pro
Feb 16, 2016
permit
Other
3•• S BROOKSCIP PROJECT: PHASE 3: 30K GALLON SURGE TANK, 16" CW26 TIE-IN TRANSMISSION MAIN AT BROOKS BPS. SPECIAL INSPECTIONS REQUIRED FOR CONCRETE. Pro Pro
Unlock values, contractors, owner names & full addresses
Pro members see every field, export CSVs and set instant alerts.
Upgrade to Pro