Facility Solutions Group
Electrical
HVAC
Records
4
Total declared value
$0
First seen
Jun 12, 2026
Last seen
Jul 16, 2026
Recent records
| Date | Type | Address | Description | Value | Contractor | Score |
|---|---|---|---|---|---|---|
| Jul 16, 2026 | permit Electrical | 4••• 1/2 E RIVERSIDE DR | Temporary construction power for jobsite ref: 2025 047435 BP | Pro | Pro | — |
| Jul 8, 2026 | permit Electrical | 3••• JEFFERSON ST | requesting an Emergency permit. Suite has lost power. Will need to replace the faulty main service breaker enclosure | Pro | Pro | — |
| Jun 22, 2026 | permit HVAC | 1•••• PARMER RDG DR | ePlan Review: New Construction Mechanical Equipment Yard. This scope was previously under 2025-116801 BP and 2025-116801 EP. AE requires that it be split off due to addressing issues with electrical meters on site. | Pro | Pro | — |
| Jun 12, 2026 | permit Electrical | 8••• SPRINGDALE RD | EMERGENCY PERMIT -EMERGENCY REPAIR - No meter work at all only replacing one-for-one a service-rated faulty disconnect. One of the three existing phases is not engaging properly | Pro | Pro | — |