DPR CONSTRUCTION

Electrical
HVAC
Roofing
Primary market: Mesa, AZ
Records
3
Total declared value
$0
First seen
Apr 12, 2016
Last seen
Apr 12, 2016

Recent records

DateTypeAddressDescriptionValueContractorScore
Apr 12, 2016
permit
Electrical
1••• S DOBSON RDELECTRICAL IMPROVEMENTS PHASE 1 PROVIDE ELECTRICAL PATHWAYS BETWEEN ELECTRICAL ROOMS IN THE HOSPITAL. PROVIDE EMPTY CONDUIT ONLY AND WILL NOT INCLUDE ANY ELECTRICAL WIRING OR CIRCUITING. THE ELECTRICAL PATHWAYS INDICATED ON THE DRAWINGS WILL CONVEY POWER BETWEEN THE SES ROOM, THE NEW 3RD FLOOR ELECTRICAL ROOM, AND A 1ST FLOOR (H) POD ELECTRICAL ROOM. THE PATHWAY WILL BE ROUTED UNDERGROUND THROU Pro Pro
Apr 12, 2016
permit
Roofing
1••• S DOBSON RDAFP - REMOVAL OF EXISTING ROOF MEMBRANE AND THE INSTALLTION OF ANEW TAPERED FOAM INSULATION SYSTEM AND BUILT UP MEMBRANE ROOFING AND RELATED SHEET METAL FLASHING. WORK ALSO INCLUDES THE INSTALLATION OF NEW ROOF DRAINS AND OVERFLWS AS SHOWN ON SHEET P2.40. ALSO INCLUDED IS THE INSTALLATION OF A ROOF TIE OFF SYSTEM AROUND THE PERIMETER DUE TO PARAPET HEIGHTS. Pro Pro
Apr 12, 2016
permit
HVAC
1••• S DOBSON RDAFP - CONVERSION OF EXISTING SHELL SPACE TO NEW CLEAN LINEN STORAGE AND EVS STORAGE SPACES. WORK INCLUDES ADDED DEMISE WALL AND UPGRADING WALL RATINGS ON EXISTING WALLS, INCLUDING APPROPRIATE HVAC DAMPERS. RELOCATION OF ONE ENTRY DOOR AND THE ADDITION OF ONE ENTRY DOOR INTO THE SPACES. THERE IS ADDED LIGHTING AND MISCELLANEOUS OUTLETS IN BOTH SPACES. WORK IS SHOWN ON SHEETS A2.25, A4.25, M2.2 Pro Pro
Unlock values, contractors, owner names & full addresses
Pro members see every field, export CSVs and set instant alerts.
Upgrade to Pro