Sunwrit
Browse
For contractors
For investors
Data sources
Pricing
Sign in
Get started
Home
/
Calixto Plumbing
Calixto Plumbing
Demolition
Plumbing
Remodel
Primary market: Austin, TX →
Records
10
Total declared value
$0
First seen
Jun 11, 2026
Last seen
Jul 16, 2026
Recent records
Date
Type
Address
Description
Value
Contractor
Score
Jul 16, 2026
permit
Plumbing
3••• VAL DR
Sewer line replacement from the home to the city tap connection. Total length of sewer line is approximately 80 feet long
Pro
Pro
25
Jul 15, 2026
permit
Remodel
4••• CAT MOUNTAIN DR
ePlan: Residential Expedited Review - Addition and Remodel to Existing Single Family Res. work to include interior remodel vault kitchen ceiling bathroom renovations new bathroom and new uncovered deck
Pro
Pro
26
Jul 14, 2026
permit
Plumbing
4••• N HILLS DR
Replace sewer line from the home to the city tap connection total length of sewer line is approximately 40 feet.
Pro
Pro
25
Jul 9, 2026
permit
Plumbing
2••• WHITESTONE DR
Tunnel under foundation to replace cast iron drain lines for 2 full bathrooms kitchen and washer drain lines. 2 access holes will be made one in the front side by doorway entrance and the second by the garage to tunnel and reroute kitchen and second bathroom total length of tunnel is approximately 60 feet of tunnel. Sewer line will be replaced from the home to the city tap connection total length
Pro
Pro
25
Jul 8, 2026
permit
Plumbing
1••• W 29TH ST
Replace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet.
Pro
Pro
25
Jul 3, 2026
permit
Plumbing
1••• KAMAR DR
Tunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drain line. Kitchen and washer drain line will be rerouted to the right side of the property we will not reroute sewer line and instead tunnel under foundation in the same locations where our access holes are but tunnel from left to right of the home total length of tunnel is 55 feet and sewer line is
Pro
Pro
25
Jun 26, 2026
permit
Demolition
4••• FAR W BLVD
EXPRESS: Exploratory Demo just removing drywall and capping off fixtures
Pro
Pro
28
Jun 24, 2026
permit
Plumbing
1••• MARKHAM LN
Sewer line replacement in the yard from clean out to the tap connection total length of 30 feet.
Pro
Pro
25
Jun 23, 2026
permit
Plumbing
3••• HIDDEN HOLW
Move main gas line for new gas meter location total legnth about 6 to 7 feet in the ground with 2 new risers.
Pro
Pro
25
Jun 11, 2026
permit
Plumbing
1••• W 42ND ST
Tunnel under foundation to replace cast iron for 2 full bathrooms kitchen and washer drain with SCH 40 PVC material. Total of 3 access holes will be made outside one where drain exits the foundation the second where kitchen and washer is located and the third will be made where the bathroom windows are on the right side of the home. Total length of tunnel is approximately 75 feet.
Pro
Pro
25
Unlock values, contractors, owner names & full addresses
Pro members see every field, export CSVs and set instant alerts.
Upgrade to Pro