Sunwrit
Browse
For contractors
For investors
Data sources
Pricing
Sign in
Get started
Home
/
CALIENTE CONSTRUCTION, INC
CALIENTE CONSTRUCTION, INC
Electrical
HVAC
Plumbing
Primary market: Mesa, AZ →
Records
4
Total declared value
$0
First seen
Apr 14, 2016
Last seen
Dec 8, 2016
Recent records
Date
Type
Address
Description
Value
Contractor
Score
Dec 8, 2016
permit
Electrical
3•• E 6TH ST
CIP PROJECT #: LF0058SESF -- REPLACING EXISTING 1200 AMP 120.240 3PHASE 4 WIRE SES WITH NEW 800AMP 120/208V 3PHASE 4 WIRE SES: MINOR ASSOICATED ELECTRICAL IMPROVEMENTS WILL BE MADE AS WELL.OCC GROUP B, H4, S2, AND S3, CONSTRUCTION TYPE IIB
Pro
Pro
—
Aug 17, 2016
permit
5•• N CENTER ST
CITY PROJECT: LF0079 ELEVATOR MODERNIZATION AND NEW CAB DESIGN FOR 2000 LB HYDRAULIC ELEVATOR. THIS INCLUDES MINOR WORK IN THE ELEVATOR MACHINE ROOM.
Pro
Pro
—
Jun 8, 2016
permit
HVAC
1•• N ROBSON
NEW PD FREEZER/COOLER INSTALL WITH ASSOCIATED MECHANICAL AND ELECTRICAL. CP0433. INCLUDES DOUBLE INTERLOCK ELECTRIC / PNEUMATIC RELEASE PRE-ACTION SYSTEM. INSTALLATION OF A NEW FE-13 IN EVIDENCE COOLER AND FREEZER. SPECIAL INSPECTIONS REQUIRED FOR STEEL, CONCRETE, EPOXY.
Pro
Pro
—
Apr 14, 2016
permit
Plumbing
3•• E 6TH ST
ADDENDUM: ADDITION OF A SD CATCH BASIN WITH CONNECTION TO AN EXISTING STAND PIPE, MODIFICATIONS TO THE PARKING LOT LIGHT POLES AND FIXTURES, RELOCATION OF THE PROPOSED FAST-FILL DISPENSING ISLAND AND ASSOCIATED GAS LINE, DELETION OF PROPOSED TIME-FILL POSTS AND ASSOCIATED GAS LINES, ADDITION OF GAS PIPING TO SERVE THE EXISTING TIME-FILL FIXTURES FROM PERMANENT COMPRESSOR STATION.
Pro
Pro
—
Unlock values, contractors, owner names & full addresses
Pro members see every field, export CSVs and set instant alerts.
Upgrade to Pro